CP-10 System Recovery and Reconstitution
Review CP-10
1. Set its parameters
No parameters to set for CP-10.
2. Record its status
Provide for the recovery and reconstitution of the system to a known state within [Assignment: organization-defined time period consistent with recovery time and recovery point objectives] after a disruption, compromise, or failure.
Discussion
Recovery is executing contingency plan activities to restore organizational mission and business functions. Reconstitution takes place following recovery and includes activities for returning systems to fully operational states. Recovery and reconstitution operations reflect mission and business priorities; recovery point, recovery time, and reconstitution objectives; and organizational metrics consistent with contingency plan requirements. Reconstitution includes the deactivation of interim system capabilities that may have been needed during recovery operations. Reconstitution also includes assessments of fully restored system capabilities, reestablishment of continuous monitoring activities, system reauthorization (if required), and activities to prepare the system and organization for future disruptions, breaches, compromises, or failures. Recovery and reconstitution capabilities can include automated mechanisms and manual procedures. Organizations establish recovery time and recovery point objectives as part of contingency planning.
Enhancements
Review CP-10(2)
1. Set its parameters
No parameters to set for CP-10(2).
2. Record its status
Implement transaction recovery for systems that are transaction-based.
Discussion
Transaction-based systems include database management systems and transaction processing systems. Mechanisms supporting transaction recovery include transaction rollback and transaction journaling.
Withdrawn
Addressed through tailoring.
Review CP-10(4)
1. Set its parameters
No parameters to set for CP-10(4).
2. Record its status
Provide the capability to restore system components within [Assignment: organization-defined restoration time periods] from configuration-controlled and integrity-protected information representing a known, operational state for the components.
Discussion
Restoration of system components includes reimaging, which restores the components to known, operational states.
Review CP-10(6)
1. Set its parameters
No parameters to set for CP-10(6).
2. Record its status
Protect system components used for recovery and reconstitution.
Discussion
Protection of system recovery and reconstitution components (i.e., hardware, firmware, and software) includes physical and technical controls. Backup and restoration components used for recovery and reconstitution include router tables, compilers, and other system software.
No Enhancements match this Baseline.
ISO/IEC 27001:2022 Crosswalk
* does not fully satisfy the intent of this control (per NIST's mapping notes).