CP-4 Contingency Plan Testing

LowModerateHigh

a.Test the contingency plan for the system [Assignment: organization-defined frequency] using the following tests to determine the effectiveness of the plan and the readiness to execute the plan: [Assignment: organization-defined tests].

b.Review the contingency plan test results; and

c.Initiate corrective actions, if needed.

Discussion

Methods for testing contingency plans to determine the effectiveness of the plans and identify potential weaknesses include checklists, walk-through and tabletop exercises, simulations (parallel or full interrupt), and comprehensive exercises. Organizations conduct testing based on the requirements in contingency plans and include a determination of the effects on organizational operations, assets, and individuals due to contingency operations. Organizations have flexibility and discretion in the breadth, depth, and timelines of corrective actions.

Enhancements

ISO/IEC 27001:2022 Crosswalk

A.5.29A.5.30*

* does not fully satisfy the intent of this control (per NIST's mapping notes).